After removing several trees and grinding the stumps and grading the site with a Bobcat, construction begins on the patios and driveways. The first pour totaled about 13 yards. The longest day included a pour of 27 yards. A total of 116 yards would be poured before the project is complete. Click the button below to see the movie.
To read more about this project, see the 2014 Chronicles page. Scroll down to the section entitled East Driveway Pour 103014.