(This article was originally published in Issue 1 of the EBG Newsletter.)
Hydro Tank #4 has been emptied and cleaned in preparation for filling and planting. Note the “gen 4” raft supports and “gen 2” flexible air hoses in the photo (above). The concrete blocks are used to keep the air hoses from floating around. The fill-up is waiting on a shipment of FloraMicro (a liquid micro nutrient solution), expected to arrive early next week.
Read more on the 2016 Chronicles page.
(This article was originally published on 092516 in Issue 1 of the EBG Newsletter)