The Master Plan 121914
Hard assets are designed for maximum utility and easy maintenance.
Hard assets are designed for maximum utility and easy maintenance.
Ugly John and his remotely-controlled stump grinder made short work of a difficult task.
Meto Murphy and his crew complete the first of many concrete pours. Pouring 116 yards in total, the concrete was installed for “Dobie”, our planned battery delivery bot.
Removing a total of 19 bushes and small trees, D’s Trees cleared the way for our gardening beds and solar panels.
This is how the property looked before modifications began. Each stage of the transformation was documented in photo and video, with highlights posted to the […]
In our family, all journeys begin and end with the land—the soil beneath our feet. From it we rise and through it we grow. On […]
Copyright © 2024 | WordPress Theme by MH Themes